Information

INJECTION MOLD P5 2 Clamping Units

The clamping unit keeps the mold closed while plasticized material is injected into it and opens the mold when the molded article is ejected. The pressure produced by the injection plunger in the cylinder is transmitted through the column of plasticized material and then through the nozzle into the mold. The unlocking force, that is, the force which tends to open the mold, is given by the product of the injection pressure and the projected area of the molding. Obviously, the clamping force must be greater than the unlocking force to hold the mold halves closed during injection.

Several techniques can be used for the clamping unit: (1) hydraulic clamps, in which the hydraulic cylinder operates on the movable parts of the mold to open and close it; (2) toggle or mechanical clamps, in which the hydraulic cylinder operates through a toggle linkage to open and close the mold; and (3) various types of hydraulic mechanical clamps that combine features of (1) and (2).

Clamps are usually built as horizontal units, with injection taking place through the center of the stationary platen, although vertical clamp presses are also available for special jobs.

Injection mold   Factory   Services   Quality   Exhibition   Information   Contact us   Copyright © Argo Mold Limited All Right Reserved